| Manage & Administer Project |
A: 119. Manage & Administer Project |
|
01/31/2021 |
01/31/2021 |
| Environmental Compliance Complete and Best Management Practices Implemented |
B: 165. Obtain Environmental Compliance |
|
01/31/2021 |
01/31/2021 |
| Viable restoration projects identified and selected for further development |
C: 114. Habitat Restoration Project Development |
|
01/31/2021 |
01/31/2021 |
| Technical Assistance Provided |
D: 122. Provide Technical Assistance & Input |
|
01/31/2021 |
01/31/2021 |
| Foley Creek Project Design data collected |
E: 175. Foley Creek Channel Realignment and Culvert Removal Project |
|
01/31/2021 |
01/31/2021 |
| Complete Final Design |
F: 175. Trout and Opal Creek Confluence - Final Design |
|
01/31/2021 |
01/31/2021 |
| Floodplain and instream habitat complexity structures Installed |
G: 29. Little Trout Creek Habitat Improvement - LWD Structures |
|
11/30/2020 |
11/30/2020 |
| Approved stream crossing installed and fish passage issues eliminated |
H: 184. Little Trout Creek Habitat Improvement - Improve Stream Crossing |
|
10/31/2020 |
09/29/2020 |
| Completed channel construction |
I: 30. Little Trout Creek Habitat Improvement - Channel Construction |
|
11/30/2020 |
11/30/2020 |
| Floodplain and active stream channel reconnected |
J: 180. Little Trout Creek Habitat Improvement - Enhance Floodplain |
|
11/30/2020 |
11/30/2020 |
| Unwanted vegetation within project area removed |
K: 199. Little Trout Creek Habitat Improvement - Vegetation Removal |
|
10/31/2020 |
10/31/2020 |
| Disturbed area replanted and reseeded with native species. |
L: 47. Little Trout Creek Habitat Improvement - Plant Riparian Vegetation |
|
01/31/2021 |
01/31/2021 |
| Disturbed upland areas will be replanted with native plants and seed. |
M: 47. Little Trout Creek Habitat Improvement - Plant Upland Vegetation |
|
01/31/2021 |
01/31/2021 |
| Reduced abundance of Noxious Weeds while promoting native vegetation in and along project areas within Trout Creek |
N: 198. Establish and maintain a self sustaining native mix of tress shrubs grasses and forbs within project areas. |
|
01/31/2021 |
01/31/2021 |
| Junipers removed from riparian areas |
O: 199. Remove encroaching juniper trees from riparian exclosures to promote native tree and shrub density |
|
01/31/2021 |
01/31/2021 |
| Trout Creek Basin Riparian Exclosures Monitored |
P: 26. Monitor Exclosures |
|
01/31/2021 |
01/31/2021 |
| Fences & Water Gaps Maintained |
Q: 186. Maintain Riparian Corridor Fence |
|
01/31/2021 |
01/31/2021 |
| Repaired/Maintained Off Channel Water Development Sites |
R: 186. Repair/Maintain Off Channel Water Development Sites |
|
01/31/2021 |
01/31/2021 |
| Maintained Instream and Floodplain Structures |
S: 186. Maintain Instream and Floodplain Structures |
|
01/31/2021 |
01/31/2021 |
| Past channel realignment instream design work and floodplain shaping actions monitored |
T: 157. Monitor past channel realignment and floodplain restoration work to refine future habitat design |
|
01/31/2021 |
01/31/2021 |
| Stream Water Temperature and Ground Water Levels Monitored |
U: 157. Monitor Stream Water In The Trout Creek Basin |
|
01/31/2021 |
01/31/2021 |
| Basin Wide Redd Counts |
V: 157. Adult Steelhead Redd Counts |
|
01/31/2021 |
01/31/2021 |
| Data Captured In Two Data Bases (One For Adults & One For Juveniles) |
W: 157. Monitor Smolt Production & Adult Escapement |
|
01/31/2021 |
01/31/2021 |
| PIT Tag Data Submitted To PTAGIS |
X: 159. Submit & Acquire PIT Tag Data To/From PTAGIS |
|
01/31/2021 |
01/31/2021 |
| ESA Listed Mid Columbia Summer Steelhead Monitored |
Y: 162. Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-Migrant Estimates |
|
01/31/2021 |
01/31/2021 |
| Final annual report for calendar year 2019 |
AA: 132. Produce Annual report for 1/1/2019 to 12/31/2019 |
|
12/18/2020 |
12/18/2020 |
| Summer Steelhead Smolts PIT Tagged |
AB: 158. CCR-45221 PIT Tag Out-Migrant Summer Steelhead Smolts |
|
09/30/2020 |
09/30/2020 |